MKA Planning are carrying out a community consultation event on behalf of Green Road Renewables (part of the Kevin Watson Group) for a proposed development of up to 10 no. wind turbines with hub heights of 55m and blade tips of 77m, including substation, underground cables, temporary contractors compound and other ancillary works at Brockagh Mountain, lands off Brockagh Road, Eglinton.

The community consultation is open to all and will take place over two days at:-

  • Location: The Eglinton Suite, White Horse Hotel, Donnybrewer Road, Campsey.
  • Date: 16th and 17th September  2015
  • Time: 5-8 pm.

Comments on the project can also be made orally or at the event or by email by 30th September at – brockaghmountainwindfarm@gmail.com.

Comments made at the community consultations are not direct representations to Council but if the developer submits a planning application there will be an opportunity to make direct representations to the Council at that stage.  If the developer submits a planning application a community consultation report incorporating all representations made will be submitted to the Council as part of the proposal.

 

Further information including plans, maps etc on the proposed development can also be accessed at the below links.

 

Site Location Plan

Distances to Dwellings from Turbines

55m Turbine Elevations

Crane Hardstanding and Turbine Foundation Plan

Temporary & Permanent Net Masts

Contractors Compound

Electrical Control Room Floor Plan

Electrical Control Room Elevations

Turbine Haul Route

Tamnaherin Turbine Haul Route

 